ABSTRACT

In this project, three alternative design solutions were considered for the foldable cam – bed. The authors utilize the local materials (with cost consideration) for the components. The merits and demerits of each of the alternative with respect to the considered group were also discusses and the solutions of the alternatives that best satisfied the limitations were selected for production. The material selected design and cost analysis, production processes and operation maintenance and problems encountered during the design were also included.

TABLE OF CONTENTS CHAPTER ONE Introduction Limitation of existing foldable camp – bed

Design specification of the foldable camp – bed

CHAPTER TWO Literature Review

Component parts of the foldable camp – bed

The Angel Iron

The catcher

The cover

The brackets

The square pipe CHAPTER THREE Design solution

Alternative A

Merit

Demerit

Alternative B

Merit

Demerit

Alternative C

Merit demerits

CHAPTER FOUR Material selection

Mild steel

Standard parts used

CHAPTER FIVE Description of foldable camp – bed CHAPTER SIX Cost and design analysis

Stages of design process

Conceptual stage

Acceptance stage

Functional stage

Translation stage

Stage of production

Weldability

Impact resistance

Possible defects in the materials

Deterioration due to wear and corrosion

Defects on workmanship

Extent of use of a particular material

CHAPTER SEVEN

Construction

CHAPTER EIGHT Economic Analysis

Material cost Analysis

Machine cost Analysis

Labour cost

CHAPTER NINE Operation of the foldable camp – bed

The viability of the system

CHAPTER TEN

Conclusion

Recommendation

References

CHAPTER ONE

1.0       INTRODUCTION

           Camp bed is used universally for relaxation, emergency eases such as war and in other several ways, it is the acknowledgement of these resources that led to the design of the foldable camp – bed. All the existing foldable camp bed, have almost the same dimension but differ in design. Some use rope and ailets while the modern design make use of wood and spring. Some other are constructed using straight bars, pipes of angle iron.

1.10          LIMITATION OF ALREADY EXISTING FOLDABLE CAMP – BED

 

Some foldable camp beds are made of Iron bars which are too heavy and cannot be carried with ease. Most existing foldable camp – bed are cumbersome to carry because their lengths which are normally six feet or 183 meters or 1830mm.

Some of the materials used for fabrication of the foldable camp bed may not be locally got and this affects its prince, making its availability to become more rare.

            In the market, design that make use of springs to hold the improvised materials or even wood are found. But when the spring fill off, its efficiency is reduced and this make it more profitable to make use of wood than spring to hold improvised mattress.

DESIGN SPECIFICATION OF THE FOLDABLE CAMP BED

It is high in weight

It can be produced locally

It is portable

It has an in built head rest which is adjustable. The tarpaulin material used in folding the foam to the wood can be easily removed along with the wood for cleaning.

It is could carry a person up to 75kg in weight. Pipes (square) used are made of galvanized steel and also the angle Iron used is made if galvanized steel both painted with aluminum oil paint to avoid corrosion.

It is easy to manipulate.

All these specification put together make this project a viable one that can compete favorably with any existing foldable camp bed and also eliminate the limitations posses by earlier designers.

Get the complete project »


Instant Share On Social Media:


Can't find what you are looking for?
Call (+234) 07030248044.

OTHER SIMILAR MECHANICAL ENGINEERING PROJECTS AND MATERIALS

CONSTRUCTION OF A STANDARD BANKING OVEN (MINI-OVEN) WITH DUAL POWER SOURCE (ELECTRIC/GAS)

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: N/A ::   Attributes: Abstract  ::   3747 engagements

ABSTRACT This project is designed to make the students utilize as many theoretical and practical concept as have been instructed in alstron to mechanical engineering workshop technology. Students ar...Continue reading »

CONSTRUCTION OF AN ELECTRICAL STOVE WITH THREE-OVEN APARTMENT

 Format: MS WORD ::   Chapters: 1 - 4 ::   Pages: 12 ::   Attributes: Abstract  ::   3937 engagements

ABSTRACT This project is concern about the construction of an electrical stove with three oven apartment is described in his project. It was carried out in order to solve the problem often encounter ...Continue reading »

CONSTRUCTION OF BATTERY CHARGE CONTROL FOR PHOTOVOLTAIC SYSTEM

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 100 ::   Attributes: Abstract  ::   4506 engagements

CHAPTER ONE INTRODUCTION BACKGROUND OF THE STUDY A charge controller is an essential part of any alternative energy system. In its simplest form, a charge controller's job is to make sure the p...Continue reading »

CONSTRUCTION OF DIGITAL WATER LEVEL CONTROLLER

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 30 ::   Attributes: Abstract

ABSTRACT Technological advancement has cuts across all aspect of human activities. However, it is on this platform that the need to minimize or check water wastage arouse. Water is a free gift of na...Continue reading »

CONSTRUCTION OF TWO FACE GAS BURNER

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: N/A ::   Attributes: N/A  ::   4496 engagements

CHAPTER ONE INTRODUCTION The construction of a two-face gas burner as a project topic that we embark upon become necessary as a way of way of putting into application the engineering and technologi...Continue reading »

DESIGN AND CONSTRUCTION OF A DIGITAL CLOCK

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 44 ::   Attributes: Abstract  ::   4249 engagements

CHAPTER ONE INTRODUCTION The world as it stands now can be said to be digitalised in every ramification and as such this project is aimed at looking for the way to change the way the time of the day...Continue reading »

What are looking for today?

WHAT OUR CUSTOMERS ARE SAYING:
  • 1. Abubakar Sani from Nigerian Investment Promotion Commission said "I had a wonderful experience using ProjectClue, they delivered not only on time, but the content had good quality. I recommend ProjectClue for any project research work.".
    Rating: Excellent
  • 2. Ogunniran Olawale from Ekiti state university said "Projectclue is really safe and reliable Quick access to project works Nice customer service Fast delivery of request Recommend this toy fellow students ".
    Rating: Excellent
  • 3. Fahat Nasir from isa kaita college of education dutsinma said "Fish farming a solution unemployment ".
    Rating: Very Good
  • 4. Ajimbi Oluwarotimi from Theology school osun said "Good ".
    Rating: Very Good
  • 5. Clement Abdullahi Ogiji from National Open University of Nigeria said "I am a living witness and have recommended project clue to a lot of students, so far none have been disappointed, very reliable and, trustworthy and dependable".
    Rating: Excellent
  • 6. Jhuee from Sultan national high school said "Good quality. I recommend project clue for any project research work.".
    Rating: Excellent