ProjectClue.com WhatsApp or Call Us

projectclue whatsapp icon07030248044

Project Topic:

CONSTRUCTION OF DIGITAL WATER LEVEL CONTROLLER

Project Information:

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 32 ::   Attributes: Abstract, Data Analysis  ::   8,514 people found this useful

Project Department:

COMPUTER SCIENCE UNDERGRADUATE PROJECT TOPICS, RESEARCH WORKS AND MATERIALS

Project Body:

ABSTRACT

Technological advancement has cuts across all aspect of human activities. However, it is on this platform that the need to minimize or check water wastage arouse. Water is a free gift of nature but due to its indispensability to human existence; it should be conserved for the purpose of constant availability or sufficiency. Moreover, in order to take a good care of this problem of wastage, there is need for the construction of water level controller this will guide against unnecessary wastage of water, for it will make a reasonable quantity of water to be used a any time. In this project, effort has been made to construct a water controller that is capable of controlling the electric water pumping motor operation in regard o switching “ON” or “OFF” at predetermined level of water in the storage tanks or reservoirs. This project also gives the clarity of advantage of using an automatic method of controlling water level over human or manual control method.

 

CHAPTER ONE

1.0       INTRODUCTION

Water is one of the most important natural resources that need to be conserved, but the rate at which water is being wasted in both he domestic and industrial activities is quite learning however, in a bid to reduce this kind of wastage in some industries, effort has been made towards the design of a “re – circulation system” in which water that has been used is made to recycle and be used again for the production processes.

In some homes is the make use of the overhead reservoirs, there s the need to make use of electric motors for the purpose of pumping water by electric motor in to these reservoirs stop usually depends on the capacity of the reservoirs (that is the time at which water fills the reservoirs to the brim) this however, usually brings about “forced leakages” through the month of the overhead tanks or reservoirs and hence, the whole environment or surroundings will become flooded with waters. This is of course, an abnormal condition.

Moreover for this reason and others that will be mentioned later, there arises the need to develop an efficient and effective means of controlled the level at which water will be pumped in the reservoirs in house and industries in order to reduce wastage of water, loading at the environments and host of other. This a water level controller that will be a supervisory system for monitoring the level of water, which a particular reservoir can contain, needs to we designed and constructed, such that when the water reaches the level at which the probe detectors of the controller are set in the tanks, the motor automatically stopped and alarm to indicate that the volume of the water pumped is enough has to be incorporated.

1.1       MOTIVATION

Of all the existing method of water conservation ranging from the privative manual control to the use of “float” to control the pumped action of the electric motors, there has not been a complete electronic method of control. In the manual control, bring compelled to climb up to a reservoir in which water in being pumped by an electric motor, in order to determined the level of the required water and for which the motor should be stopped, be not the best way of using qualified manpower. Besides, this offers a very tedious working condition to the working personnel’s on the whole.

However; improper way of controlling the water level in the overhead tanks or reservoir is contributing to the problem of water wastage and environmental flooding which can lead to inconvenience for the people around, damage of the property and other valuable materials in homes and industries.       

Hence, the real motivation in having this supervisory unit equipment is based on its advantages of the ability to detect the presence of water at a predetermined level and then controlling of the pumping operation in basically completed electronic mode, the advantage which reduces the problems associated age which reduces the problems associated with improper way of water level centered. 

1.2       LAYOUT OF REPORT

The report layout all the proceedings involve in the project from chapter one to chapter five.

  • Chapter one discusses introduction, which covers the motivation.
  • Chapter two deals with the literature review and the general knowledge of entire system .
  • Chapter three is on the system design, calculation and mode of operation.
  • Chapter four describes he constructions testing and problems encountered as well as the courses of the project.
  • Chapter five presents conclusion and the recommendation.

Get the complete project »


Instant Share On Social Media:


Can't find what you are looking for?
Call (+234) 07030248044.

OTHER SIMILAR COMPUTER SCIENCE PROJECTS AND MATERIALS

A DESIGN AND IMPLEMENTATION OF A SOFTWARE DEVELOPMENT TO SHOW A QUICK GLANCE OF NYSC PLACE OF PRIMARY ASSIGNMENT(PPA) A STUDY OF EBONYI STATE

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 52 ::   Attributes: Abstract  ::   3613 engagements

ABSTRACT This project work is a documentation of NYSC Place of primary Assignment, a system that will allow users to have a glance of corps PPA, information for the purpose of future record and acce...Continue reading »

A GEOGRAPHICAL INFORMATION RETRIEVAL SYSTEM

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 39 ::   Attributes: Sort code, Abstract  ::   7804 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF STUDY According to Chang, K. T. (2008), Geographic Information Retrieval System (GIRS) is a system designed to capture, store, manipulate, analyze, manage...Continue reading »

A PROTOTYPE OF STUDENT EVALUATION SYSTEM

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 72 ::   Attributes: Sort code, Abstract  ::   8052 engagements

CHAPTER ONE 1.0 INTRODUCTION 1.1. BACKGROUND OF THE STUDY Evaluation is the systematic determination of merit, worth and significance of something or someone. Evaluation often is used to characteri...Continue reading »

A STUDY INTO THE CHALLENGES AND PROSPECTS OF MARKETING NIGERIAN MADE COMPUTER SOFTWARES

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 65 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   12233 engagements

CHAPTER ONE 1.1. Background to the Study Made-in-Nigeria softwares are those that are produced within Nigeria. Nigeria as a third world country needs to produce its own software so that it will help...Continue reading »

A SURVEY OF DATA BASE MANAGEMENT IN ENHANCING THE WORK PERFORMANCE OF OTM GRADUATES IN SELECTED ORGANISATIONS IN ABUJA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 61 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   14156 engagements

CHAPTER ONE 1.1. BACKGROUND OF THE STUDY A database is an organized collection of data.[1] It is the collection of schemes, tables, queries, reports, views and other objects. The data is typically o...Continue reading »

AIRLINE RESERVATION AND TICKETING IN A COMMERCIAL AIRLINE COMPANY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 60 ::   Attributes: source code,Abstract  ::   6603 engagements

ABSTRACT Airline reservation and ticketing in a commercial airline company is a project work aimed at creating a system that will enable traveler’s book their flight by making reservations. As ...Continue reading »

What are looking for today?

WHAT OUR CUSTOMERS ARE SAYING:
  • 1. Abubakar Sani from Nigerian Investment Promotion Commission said "I had a wonderful experience using ProjectClue, they delivered not only on time, but the content had good quality. I recommend ProjectClue for any project research work.".
    Rating: Excellent
  • 2. Ogunniran Olawale from Ekiti state university said "Projectclue is really safe and reliable Quick access to project works Nice customer service Fast delivery of request Recommend this toy fellow students ".
    Rating: Excellent
  • 3. Fahat Nasir from isa kaita college of education dutsinma said "Fish farming a solution unemployment ".
    Rating: Very Good
  • 4. Ajimbi Oluwarotimi from Theology school osun said "Good ".
    Rating: Very Good
  • 5. Clement Abdullahi Ogiji from National Open University of Nigeria said "I am a living witness and have recommended project clue to a lot of students, so far none have been disappointed, very reliable and, trustworthy and dependable".
    Rating: Excellent
  • 6. Jhuee from Sultan national high school said "Good quality. I recommend project clue for any project research work.".
    Rating: Excellent