ProjectClue.com WhatsApp or Call Us

projectclue whatsapp icon07030248044

Project Topic:

THE EFFECTIVENESS AND OBSTRUCTS OF SANDCRETE AND CONCRETE BLOCK IN A FOUNDATION SYSTEM (A PROJECT REPORT PREPARED)

Project Information:

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 32 ::   Attributes: Abstract  ::   5,163 people found this useful

Project Department:

CIVIL ENGINEERING UNDERGRADUATE PROJECT TOPICS, RESEARCH WORKS AND MATERIALS

Project Body:

ABSTRACT

It is a clear fact that bricks play a vital role in a foundation system of a building. And also that the strongness and weakness of a building depends solidly on the method(s) employed in moulding the bricks which are used in laying the foundation of a building.         This project has a report comprise the effectiveness and obstruct of both concrete and sandcrete blocks.          Also the area of application of both the sandcrete and concrete blocks are stated in chapter two of this report. Furthermore, the method, and steps employed in moulding a block is also emphasized. Finally, we students achieved our aims practically by moulding the blocks been used in this practical project personally which is hopeful that in future or job career that this experience will be useful and be a good ambassador of this institution.

 

CHAPTER ONE

1.0    INTRODUCTION

1.1    BACKGROUND OF THE STUDY

This project work describes the practical experience of a construction of block moulding with concrete and sandcrete in the department of civil engineering and the faculty of engineering.

This project provides a proven base of knowledge for effective use of theory being taught in the lecture room. A student being denied practical aspect of building, moulding of blocks, construction of culvert e.t.c. will not be relevant or performed brilliantly when called upon to supervise simple project, such student will not be able to defend his/her certificate after his/her educational career.

From the background of Civil Engineering materials, it is known that it has not teen stated that sandcrete block with the mixture of sand and cement or other constituents can also be used as alternative for blocking materials.

According to the research of different soils engineer’s textbooks and from internet. It has not been discovered that sandcrete hollow block can be used as alternates for sandcrete materials. According to Ravindrok and Jackson [civil engineering materials 1990] and various applied researchers are able to mention the materials, which are available for sandcrete materials, such as sand, cement and water.

Depending in the project, sandcrete blocks have became obvious useful in different types of civil engineering work in the past and recent times all sandcrete bricks have similar uses, their properties differ in some respect depending on the materials used and method of manufacture to understand these properties. It is essential that sandcrete blocks are to be used the general prevention of the product and satisfactory behaviour in services is highly important.

1.2    AIMS AND OBJECTIVES

The aim and objectives of this project is to have a practical experience on how a block is constructed using the various construction tools.

1. To enlighten the students in the used of different engineering tools for different job.

2. To enlightens the civil engineering student in the used of different works.

3. To let them known the ratio of each mix for a building construction work e.g. the ratio of block moldings, plastering and rendering e.t.c

4. To enable the student be able to identify different types of sand and when they are use for a 0onstrucfiOfl of a building.

5. To improve the standard of the student for better used.

6. To improve standard of learning in the faculty i.e. by building a block industry, store and reservoir for the development of the department.

7. To know the water absorption of different types of block and their densities.

1.3    SCOPE OF STUDY

The scope of the study limit on the practical experience of a building with reference to the construction of the department of Civil Engineering Block Industry in the steps taking in the construction, what should be put in place tools to be used, material which is require, quantity of material to be used as well on the price and cost of each material used throughout the project work.

1.4    OBSERVATION OF THE PROJECT

Our observation mostly, during this study and project is that the project has given to manly investigation research and different means of collecting data on the site, textbook, Internet and other ways of collecting data. It also helped us to have knowledge and understanding on the topic

1.5    LIMITATION TO THE PROJECT

These are the factors that make the execution of this project delayed, namely:

  • Time aspect
  • Financial problem
  • Mechanical problem
  • Misunderstanding among the student
  • Poor arrangement for commencement of the project

Get the complete project »


Instant Share On Social Media:


Can't find what you are looking for?
Call (+234) 07030248044.

OTHER SIMILAR CIVIL ENGINEERING PROJECTS AND MATERIALS

DOMESTIC WASTE WATER TREATMENT IN NIGERIA

 Format: MS WORD ::   Chapters: 1 - 5  ::   Pages: 35 ::   Attributes: N/A  ::   8056 engagements

Abstract The ever popular issue on environment preservation and sustainability all over the world has led to innovations of new material using by treated generated from various sectors resulting from...Continue reading »

EVALUATION OF THE EFFECTS OF SOLID WASTE (REFUSE DUMP) ON SURFACE AND UNDERGROUND WATER IN MOSADOLUWA COMMUNITY IN OSOGBO LOCAL GOVERNMENT

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 36 ::   Attributes: N/A  ::   4841 engagements

General Background There has been an increasing concern about the environment in which man lives. Solid wastes mount of rubbish, garbage and sewage are being produced everyday by our urban society. W...Continue reading »

PROJECT COST CONTROL IN THE NIGERIAN CONSTRUCTION INDUSTRY (A CASE STUDY OF EL-ALAN CONSTRUCTION COMPANY (NIGERIA) LIMITED)

 Format: MS WORD ::   Chapters: 1 - 5  ::   Pages: 67 ::   Attributes: Questionnaire, Data Analysis  ::   4747 engagements

CHAPTER ONE INTRODUCTION Background of the study Project cost controls in the Nigerian construction sector have always been under studied. On the course of prosecuting a project, controlling the co...Continue reading »

RIMARY CAUSES OF ROAD PAVEMENT FAILURE AND POSSIBLE SOLUTION

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 59 ::   Attributes: Table of Content, Questionnaire, Data Analysis  ::   10305 engagements

ABSTRACT This project investigates the primary causes of Road Pavement Failure and Possible Solution (a case study of Iree-Ibokun road). Various tests are carried out on soil samples colleted from fa...Continue reading »

THE ASSESSMENT OF FACTORS AFFECTING TENDERING IN CONSTRUCTION PROJECTS: CASE STUDY OF LAGOS STATE

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   5620 engagements

CHAPTER ONE INTRODUCTION 1.1. BACKGROUND OF THE STUDY Construction industry is very important in the economic development of any nation especially in expanding economy like Nigeria [Ibironke, 2012]...Continue reading »

THE EFFECT OF MATERIAL CONTROL ON HIGHWAY PROJECT SUCCESS

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   6461 engagements

CHAPTER ONE INTRODUCTION 1.1. BACKGROUND OF THE STUDY Traditionally, project success was assessed on the triple measure set of cost, time, and performance. A project is considered successful if it ...Continue reading »

What are looking for today?

WHAT OUR CUSTOMERS ARE SAYING:
  • 1. Abubakar Sani from Nigerian Investment Promotion Commission said "I had a wonderful experience using ProjectClue, they delivered not only on time, but the content had good quality. I recommend ProjectClue for any project research work.".
    Rating: Excellent
  • 2. Ogunniran Olawale from Ekiti state university said "Projectclue is really safe and reliable Quick access to project works Nice customer service Fast delivery of request Recommend this toy fellow students ".
    Rating: Excellent
  • 3. Fahat Nasir from isa kaita college of education dutsinma said "Fish farming a solution unemployment ".
    Rating: Very Good
  • 4. Ajimbi Oluwarotimi from Theology school osun said "Good ".
    Rating: Very Good
  • 5. Clement Abdullahi Ogiji from National Open University of Nigeria said "I am a living witness and have recommended project clue to a lot of students, so far none have been disappointed, very reliable and, trustworthy and dependable".
    Rating: Excellent
  • 6. Jhuee from Sultan national high school said "Good quality. I recommend project clue for any project research work.".
    Rating: Excellent