ProjectClue.com WhatsApp or Call Us

projectclue whatsapp icon07030248044

Project Topic:

PROJECT COST CONTROL IN THE NIGERIAN CONSTRUCTION INDUSTRY (A CASE STUDY OF EL-ALAN CONSTRUCTION COMPANY (NIGERIA) LIMITED)

Project Information:

 Format: MS WORD ::   Chapters: 1 - 5  ::   Pages: 67 ::   Attributes: Questionnaire, Data Analysis  ::   4,801 people found this useful

Project Department:

CIVIL ENGINEERING UNDERGRADUATE PROJECT TOPICS, RESEARCH WORKS AND MATERIALS

Project Body:

CHAPTER ONE

INTRODUCTION

Background of the study

Project cost controls in the Nigerian construction sector have always been under studied. On the course of prosecuting a project, controlling the cost of these projects would help in maintaining such projects from being too capital intensive which may lead to the project being abandoned. For every project to be successfully executed, its cost must have been analyzed and the cost from start to finish noted so as to prevent unnecessary contingency spendings which may hamper the complete execution of the project. Cost control includes monitoring cost, task completion, and time. If total cost of a project at a given time is over the cost baseline, cost control measures may be necessary. Such project management actions may range from ensuring that only tasks within the scope of the work are being performed to alerting stakeholders of potential cost overruns. As a project manager, it is important, professional, and ethical to identify and report on these issues as soon as they are identified.

Organizations whether private or government owned must complete projects on budget to achieve financial objectives and save cost. Project managers applying cost control techniques effectively can ensure that projects stay within projected budgets or are allowed to exceed budgets in a controlled way for specific reasons. When an organization implements appropriate project cost controls, it reduces risk and receives the full benefits anticipated from project completion.

Controlling costs means meeting a budget that is based on cost estimates. The two components of such estimates are the scope of the work and the cost of each completed task. The project plan details the requirements for the project, which you have to translate into activities. A typical activity requires labor, materials and equipment. Once you have defined the project scope in terms of activities and divided the activity into its cost components, you can calculate cost estimates using costs from historical sources, bids, industry norms and other projects as a base.                                                                                  

Statement of the general problem

The increase in the number of abandoned, uncompleted and under completed projects by individuals, companies and even government has been a cause for serious concern. This high rate of abandonment has inflicted our infrastructural development negatively and may have dissuadedprospective investors from investing in our economy.

Aims and objectives of the study

The following will be our aims and objectives for undertaking this study

  • To examine the level of implementation of project cost control in the Nigerian construction industry.
  • To know if adherence to project cost control increases the profitability of Nigerian construction industry.
  • To know if project cost control improves the Nigerian construction industry.
  • To know if project cost control reduces abandonment and under completion of projects

Research Question

  • What is the impact of project cost control on the Nigerian construction industry?
  • Does project cost control enhance the quality of constructions in the Nigerian construction industry?
  • What is the impact of project cost control on the infrastructural development of Nigeria?
  • Is there a relationship between project cost control and economic development in Nigeria?

Research Hypothesis

H0: Effective project cost control does not improve the quality of constructions in the Nigerian construction industry.

H1: Effective project cost control does improve the quality of constructions in the Nigerian construction industry.

Significance of the study

This study will be of great importance to project managers, government, researchers and captains of industries seeing that it would unravel the implications and benefits of ensuring project cost control in the Nigerian construction industry and the economy of Nigeria at large.

Scope of the study

This study is restricted to project cost control in the Nigerian construction industry with EL-ALAN Construction Company (Nigeria) Limited as its case study.

Limitation of the study

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

Definition of terms

  • Project:A planned piece of work that is designed to find information about something, to produce something new, or to improve something.
  • Cost:the amount of money that you need in other to buy, make or do something.
  • Construction:the process or method of building or making something, especially roads, building, bridges etc.

Get the complete project »


Instant Share On Social Media:


Can't find what you are looking for?
Call (+234) 07030248044.

OTHER SIMILAR CIVIL ENGINEERING PROJECTS AND MATERIALS

DOMESTIC WASTE WATER TREATMENT IN NIGERIA

 Format: MS WORD ::   Chapters: 1 - 5  ::   Pages: 35 ::   Attributes: N/A  ::   8150 engagements

Abstract The ever popular issue on environment preservation and sustainability all over the world has led to innovations of new material using by treated generated from various sectors resulting from...Continue reading »

EVALUATION OF THE EFFECTS OF SOLID WASTE (REFUSE DUMP) ON SURFACE AND UNDERGROUND WATER IN MOSADOLUWA COMMUNITY IN OSOGBO LOCAL GOVERNMENT

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 36 ::   Attributes: N/A  ::   4901 engagements

General Background There has been an increasing concern about the environment in which man lives. Solid wastes mount of rubbish, garbage and sewage are being produced everyday by our urban society. W...Continue reading »

RIMARY CAUSES OF ROAD PAVEMENT FAILURE AND POSSIBLE SOLUTION

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 59 ::   Attributes: Table of Content, Questionnaire, Data Analysis  ::   10387 engagements

ABSTRACT This project investigates the primary causes of Road Pavement Failure and Possible Solution (a case study of Iree-Ibokun road). Various tests are carried out on soil samples colleted from fa...Continue reading »

THE ASSESSMENT OF FACTORS AFFECTING TENDERING IN CONSTRUCTION PROJECTS: CASE STUDY OF LAGOS STATE

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   5691 engagements

CHAPTER ONE INTRODUCTION 1.1. BACKGROUND OF THE STUDY Construction industry is very important in the economic development of any nation especially in expanding economy like Nigeria [Ibironke, 2012]...Continue reading »

THE EFFECT OF MATERIAL CONTROL ON HIGHWAY PROJECT SUCCESS

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   6502 engagements

CHAPTER ONE INTRODUCTION 1.1. BACKGROUND OF THE STUDY Traditionally, project success was assessed on the triple measure set of cost, time, and performance. A project is considered successful if it ...Continue reading »

THE EFFECTIVENESS AND OBSTRUCTS OF SANDCRETE AND CONCRETE BLOCK IN A FOUNDATION SYSTEM (A PROJECT REPORT PREPARED)

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 32 ::   Attributes: Abstract  ::   5201 engagements

ABSTRACT It is a clear fact that bricks play a vital role in a foundation system of a building. And also that the strongness and weakness of a building depends solidly on the method(s) employed in mo...Continue reading »

What are looking for today?

WHAT OUR CUSTOMERS ARE SAYING:
  • 1. Abubakar Sani from Nigerian Investment Promotion Commission said "I had a wonderful experience using ProjectClue, they delivered not only on time, but the content had good quality. I recommend ProjectClue for any project research work.".
    Rating: Excellent
  • 2. Ogunniran Olawale from Ekiti state university said "Projectclue is really safe and reliable Quick access to project works Nice customer service Fast delivery of request Recommend this toy fellow students ".
    Rating: Excellent
  • 3. Fahat Nasir from isa kaita college of education dutsinma said "Fish farming a solution unemployment ".
    Rating: Very Good
  • 4. Ajimbi Oluwarotimi from Theology school osun said "Good ".
    Rating: Very Good
  • 5. Clement Abdullahi Ogiji from National Open University of Nigeria said "I am a living witness and have recommended project clue to a lot of students, so far none have been disappointed, very reliable and, trustworthy and dependable".
    Rating: Excellent
  • 6. Jhuee from Sultan national high school said "Good quality. I recommend project clue for any project research work.".
    Rating: Excellent