ProjectClue.com WhatsApp or Call Us

projectclue whatsapp icon07030248044

Project Topic:

DESIGN AND IMPLEMENTATION OF WEB BASED TIME TABLE SYSTEM FOR COMPUTER SCIENCE DEPARTMENT

Project Information:

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 58 ::   Attributes: Sort code, Abstract  ::   7,520 people found this useful

Project Department:

COMPUTER SCIENCE UNDERGRADUATE PROJECT TOPICS, RESEARCH WORKS AND MATERIALS

Project Body:

CHAPTER ONE

INTRODUCTION

The academic environment has gone so complex that an automated system may be required to automate certain aspects of the academic system. One such area of difficulty is timetable scheduling; those saddled with the responsibility of time table creation are always faced with challenges of creating effective system that will deliver its purpose.

Automation has been seen as a way of enhancing Manual activities. For instance, Manual operations are characterized with some setbacks such as erroneous computation etc. with automation, those setbacks are either eliminated or reduced to barest minimal. To this effect application are being created to hide the manual operations and project automation.

The general task of solving timetable scheduling problems is iterative and time consuming. In real world application, the participants to the timetable scheduling have conflicting preferences which make the search for an optimal solution a problem. In order to solve the problem it is necessary to find a compromise between all the parties involved in the requirement, usually conflicting (e.g. day, time). The constraints are related to the availability, timetabling and preference of each of the instructor, to rooms availability, number of student and curricula. In order to solve this problem for the particular case of university system, timetable scheduling has to adopt the computer-base approach. Computer-base approach enables the institution to automate certain manual task and work efficiently. Also, in the particular case of timetable scheduling, the automated system could find an optimal or a sub-optimal solution using mainly inter agent communication.

1.1 PROBLEM DEFINITION

The scheduling problem can be defined as a problem of finding the optimal sequence for evaluating a finite set of operation (task or job) under a certain set of constrains that must be satisfied . A typical example of scheduling problem is timetable scheduling. The problems to be solved by timetable scheduling are mapped out below.

  1. Maximize individual in timetable scheduling or other resources.
  2. Minimize time required to complete the entire process for timetable scheduling.
  3. Production of timetable and of conflict interest, place, etc.

All these problems and more are to be solved so that the proposal solution for timetable scheduling will be an enchantment over the manual.

1.2. AIM AND OBJECTIVES.

In solving problems of timetable scheduling, there is need for an effective and efficient techniques or methods.

The only method proven to be effective and effective is the computer-based approach. The approach that automates all the manual concepts of timetable scheduling thereby eliminate all the problems associated with the manual technique.

To this end, this project work is designed to introduce computer bases approach to the manual method of timetable scheduling.

1.3 SCOPE OF THE STUDY.

Timetable scheduling is a complex and time consuming process. Generating timetable for all levels in a university system will definitely take a lot time. For the purpose of this work, time able creation will be based on degree programme only with focus on 100 and 200 level courses, this will be an effective way to start the process of time table creation.

Also, the work will be made to run on the internet backbone this will make the application distributed and network based.

1.4 LIMITATION OF THE STUDY

The proposed development is a time consuming process to this end the project will be streamline to 100 and 200-degree programme due to time limitation.

Another problem is the inadequate research materials on the subject of timetable scheduling and creation. This project work made use of the little available materials.

1.5 ORGANIZATION OF THE WORK

The project work is organized into chapter for the purpose of clarity. The remaining part of this work is organized thus:  chapter two discusses the review of relevant literature on timetable on timetable scheduling and optimization.

Chapter three focuses on the design of the processes are discussed on this chapter.

Chapter four discusses the implementation of the developed system. Chapter five concludes the work with conclusion and recommendation

Get the complete project »


Instant Share On Social Media:


Can't find what you are looking for?
Call (+234) 07030248044.

OTHER SIMILAR COMPUTER SCIENCE PROJECTS AND MATERIALS

A DESIGN AND IMPLEMENTATION OF A SOFTWARE DEVELOPMENT TO SHOW A QUICK GLANCE OF NYSC PLACE OF PRIMARY ASSIGNMENT(PPA) A STUDY OF EBONYI STATE

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 52 ::   Attributes: Abstract  ::   3758 engagements

ABSTRACT This project work is a documentation of NYSC Place of primary Assignment, a system that will allow users to have a glance of corps PPA, information for the purpose of future record and acce...Continue reading »

A GEOGRAPHICAL INFORMATION RETRIEVAL SYSTEM

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 39 ::   Attributes: Sort code, Abstract  ::   7966 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF STUDY According to Chang, K. T. (2008), Geographic Information Retrieval System (GIRS) is a system designed to capture, store, manipulate, analyze, manage...Continue reading »

A PROTOTYPE OF STUDENT EVALUATION SYSTEM

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 72 ::   Attributes: Sort code, Abstract  ::   8221 engagements

CHAPTER ONE 1.0 INTRODUCTION 1.1. BACKGROUND OF THE STUDY Evaluation is the systematic determination of merit, worth and significance of something or someone. Evaluation often is used to characteri...Continue reading »

A STUDY INTO THE CHALLENGES AND PROSPECTS OF MARKETING NIGERIAN MADE COMPUTER SOFTWARES

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 65 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   12393 engagements

CHAPTER ONE 1.1. Background to the Study Made-in-Nigeria softwares are those that are produced within Nigeria. Nigeria as a third world country needs to produce its own software so that it will help...Continue reading »

A SURVEY OF DATA BASE MANAGEMENT IN ENHANCING THE WORK PERFORMANCE OF OTM GRADUATES IN SELECTED ORGANISATIONS IN ABUJA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 61 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   14302 engagements

CHAPTER ONE 1.1. BACKGROUND OF THE STUDY A database is an organized collection of data.[1] It is the collection of schemes, tables, queries, reports, views and other objects. The data is typically o...Continue reading »

AIRLINE RESERVATION AND TICKETING IN A COMMERCIAL AIRLINE COMPANY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 60 ::   Attributes: source code,Abstract  ::   6759 engagements

ABSTRACT Airline reservation and ticketing in a commercial airline company is a project work aimed at creating a system that will enable traveler’s book their flight by making reservations. As ...Continue reading »

What are looking for today?

WHAT OUR CUSTOMERS ARE SAYING:
  • 1. Abubakar Sani from Nigerian Investment Promotion Commission said "I had a wonderful experience using ProjectClue, they delivered not only on time, but the content had good quality. I recommend ProjectClue for any project research work.".
    Rating: Excellent
  • 2. Ogunniran Olawale from Ekiti state university said "Projectclue is really safe and reliable Quick access to project works Nice customer service Fast delivery of request Recommend this toy fellow students ".
    Rating: Excellent
  • 3. Fahat Nasir from isa kaita college of education dutsinma said "Fish farming a solution unemployment ".
    Rating: Very Good
  • 4. Ajimbi Oluwarotimi from Theology school osun said "Good ".
    Rating: Very Good
  • 5. Clement Abdullahi Ogiji from National Open University of Nigeria said "I am a living witness and have recommended project clue to a lot of students, so far none have been disappointed, very reliable and, trustworthy and dependable".
    Rating: Excellent
  • 6. Jhuee from Sultan national high school said "Good quality. I recommend project clue for any project research work.".
    Rating: Excellent